Rural grain haulage route VIC
This rural road serves a grain storage facility that takes about 250,000 tonnes a season, on an estimated 5,750 truck visits a year. The gravel section was graded before and after every harvest and still broke up through winter under heavy vehicles. The council trialled RDC in November 2023, applied by its own grader crew during a routine maintenance grade, with the road never closed to traffic.
- No grading maintenance in 24 months Two full harvest seasons and two winters since the single treatment, with no grading or re-sheeting either.
- Water cart use almost eliminated Watering for dust suppression stopped, easing demand on local supply and sediment runoff into neighbouring farmland.
An unexpected but highly beneficial outcome was how well the road performed during winter conditions. After rain events and heavy traffic, the surface did not rut or deteriorate. The treated pavement remained intact and was able to withstand excess moisture.
Council trial report, prepared by the shire’s civil engineer