A gravel road winding through green valleys towards a lake and snow-capped mountains at sunrise

Practicalsolutionsforbettersiteperformance.

Gravel Lock Australia delivers proven, cost-effective dust suppression, erosion control and road maintenance solutions tailored to the needs of Australia's mining, quarrying, civil construction and local government sectors.

About Gravel Lock

Where science
meets the earth.

Gravel Lock CSC and RDC IBC totes either side of a PHF pot hole mix pail

Established technology. Decades of industry experience. Practical solutions.

Gravel Lock began in New Zealand, where founder Grant Lewis spent over 15 years developing and testing alternatives to traditional road construction, dust suppression and maintenance methods.

James Davies brought that technology to Australia, combining it with nearly 40 years across road construction, quarrying, materials development and site operations.

Our approach is simple — understand the problem, apply the right solution and deliver practical, cost-effective results.

2 million+
Litres supplied across Australia
1 million m²
Treated area
15
Countries installed
15+
Years of product development

Supplying NSW, SA, VIC, NT, QLD and WA, with sales teams and distributors in New Zealand, Australia, Indonesia, Germany, Dubai and the Pacific Islands.

Meet the people behind Gravel Lock

Three products. Built for real‑world conditions.

Specialist solutions for dust suppression, erosion control and pavement repairs, designed to address the challenges of working roads, exposed ground and demanding site conditions.

01 / 03 RDC Road Dust Control Creating hygroscopic pavements

Dust Suppression

A water truck spraying RDC across a quarry haul road

Control dust. Retain moisture. Protect your pavement.

RDC is a specially formulated dust suppression and pavement maintenance treatment designed for longer-lasting dust control on unsealed roads and working areas.

Its moisture-retaining properties penetrate the pavement, helping bind fine materials, reduce airborne dust and minimise water cart requirements.

By maintaining a tighter, more stable surface, RDC can also reduce corrugations, material loss and grading frequency, making it ideal for mine and quarry haul roads, rural roads and industrial hardstands.

Treatment designed around your site.

No two sites are the same. RDC application rates are determined by pavement condition, traffic volumes, site requirements and the desired treatment life.

From lightly trafficked rural roads to heavily used haul roads and hardstands, Gravel Lock recommends a treatment program suited to the conditions and operational requirements of each site.

Applied with
Water cart or tractor spray
  • Mine haul roads
  • Quarries
  • Gravel rural roads
  • Forestry roads
  • Hardstand yards
  • Construction sites
  • Moisture retention
  • Dust suppression
  • Retaining pavement fines
  • Reduced road maintenance
  • Application using existing equipment
  • Flexible treatment and maintenance
Find out more about RDC
02 / 03 CSC Co-Polymer Soil Cement Creating super thin protective skins

Erosion Control

A Gravel Lock water truck spraying CSC onto a quarry batter, the white protective layer forming on the slope

Protect exposed surfaces from wind and water erosion.

CSC is a concentrated liquid polymer that binds loose material to form a durable protective layer over exposed ground.

Diluted with water and sprayed onto surfaces, CSC helps control windblown dust, limit water penetration and reduce erosion caused by rainfall.

Suitable for stockpiles, batters, embankments and disturbed areas, CSC provides temporary or longer-term protection across a range of soil and aggregate surfaces. It can also be used in hydroseeding to support moisture retention and vegetation establishment.

Dust and light erosion
100 mL/m²
Banks and heavy erosion
200 mL/m²
Applied with
Hydroseeder or flow pump
  • Stockpiles
  • Batters and embankments
  • Overburden
  • Disturbed ground
  • Hydroseeding
  • Land rehabilitation
  • Surface binding and protection
  • Windblown dust control
  • Water penetration and erosion control
  • Weather and UV resistance
  • Hydroseeding and revegetation
  • Practical application across different sites
Find out more about CSC
03 / 03 PHF Coldmix Pothole Fill Permanent pothole repair

Pothole Repair

A road worker in hi-vis raking PHF Coldmix level into a pothole, cones and a ute behind

Durable repairs. Proven performance. Built to last.

PHF is a high-performance coldmix asphalt designed for strong, long-lasting repairs to potholes, edge breaks and damaged pavement surfaces.

Its advanced formulation delivers excellent adhesion, flexibility and resistance to traffic wear, even in demanding conditions.

Easy to apply without heating, PHF can be opened to traffic after correct placement and compaction, minimising disruption and repeat repairs. Ideal for councils, road contractors, utilities and industrial applications.

Return to traffic
After placement and compaction
Working range
-5°C to +50°C
Shelf life
9‑12 months sealed
  • Potholes and edge breaks
  • Utility reinstatements
  • Speed humps
  • Council roads
  • Wet-weather repairs
  • Quarry own-brand coldmix
Find out more about PHF

PHF Binder

Make your own coldmixwith PHF Binder.

PHF Binder enables quarry operators, landscape supply businesses and construction material suppliers to manufacture premium polymer-modified coldmix asphalt using their own aggregates.

Turn your aggregate into a higher-value product.

Expand your product range, create new revenue opportunities and supply councils, civil contractors and road maintenance crews.

Gravel Lock Australia provides guidance on aggregate grading, binder requirements and mixing methods to help maximise yield and achieve a consistent finished product.

A front loader tipping finished black coldmix onto a stockpile in a quarry yard, a branded PHF tote on a pallet alongside

Three key advantages

  • Value-add your aggregate

    Transform existing materials into premium coldmix asphalt, expanding your product range and revenue opportunities.

  • Use your existing equipment

    Simple onsite production using suitable existing equipment, with no specialised blending plant required.

  • 9–12 months storage life

    Produce in batches, store and package for future sale or use, with up to 9–12 months workability under suitable conditions.

Proven where roads work hardest.

From quarry haul roads and mine sites to rural roads and industrial areas, Gravel Lock delivers practical, site-specific solutions through the right products and application methods, proven in demanding Australian conditions.

  • 15+ yrs

    Product development

    Research, laboratory testing and field trials

  • 6 states

    Supplied across

    NSW, SA, VIC, NT, QLD and WA

  • 2M+ L

    RDC supplied

    Delivered to sites across Australia

  • 9–12 mths

    PHF storage life

    Workable when packaged and stored correctly

See our projects

A selection of Gravel Lock applications across quarries, haul roads, council networks and private sites — what was treated, and what it changed.

A grain truck on a treated gravel road running straight between stubble paddocks under a clear sky

Rural grain haulage route VIC

This rural road serves a grain storage facility that takes about 250,000 tonnes a season, on an estimated 5,750 truck visits a year. The gravel section was graded before and after every harvest and still broke up through winter under heavy vehicles. The council trialled RDC in November 2023, applied by its own grader crew during a routine maintenance grade, with the road never closed to traffic.

  • No grading maintenance in 24 months Two full harvest seasons and two winters since the single treatment, with no grading or re-sheeting either.
  • Water cart use almost eliminated Watering for dust suppression stopped, easing demand on local supply and sediment runoff into neighbouring farmland.

An unexpected but highly beneficial outcome was how well the road performed during winter conditions. After rain events and heavy traffic, the surface did not rut or deteriorate. The treated pavement remained intact and was able to withstand excess moisture.

Council trial report, prepared by the shire’s civil engineer
Location
Victoria
Industry
Council roads — grain haulage
Product
RDC Road Dust Control
Treated
November 2023
A treated quarry entry haul road running uphill between gum trees, the surface tight and even from edge to edge

Blue metal quarry NSW

The main entry road and weighbridge access at this long-established blue metal quarry are among the most heavily trafficked ground on site, carrying roughly 400 truck movements a week. Both were watered constantly and still shed their fines. Gravel Lock supervised the first application on 2 September 2025: the 2.1 km haul road at a 20% dilution with daily top-ups for four days, and the weighbridge loop at 3 litres per square metre of straight RDC.

  • Watering cut to once every 10 days On the 2.1 km entry and exit haul road, down from several applications a day.
  • No maintenance watering at the weighbridge None required since treatment, with that surface expected to hold for over nine months.
  • Dust down within hours Visibility on the entrance road and around the weighbridge improved the same day, and loose aggregate stopped moving under braking.

The results speak for themselves, far less dust, safer conditions for trucks and light vehicles and a pavement that’s holding up well without the usual wear or maintenance. We’ve cut right back on water cart use and interactions with traffic, which means lower costs, less downtime and more efficient operations overall.

Jeff, Operations Manager
Location
New South Wales
Industry
Quarry — stemming and quarried materials
Product
RDC Road Dust Control
Treated
September 2025
A treated gravel road running between snow gums in Kosciuszko National Park, the surface even and tightly bound

Unsealed section, Kosciuszko National Park NSW

A 1.5 km unsealed section of a primary access road in Kosciuszko National Park is maintained by Transport for NSW and re-sheeted after every snow season. RDC went on over uncompacted new pavement on 3 October 2024, without closing the road, and the section was inspected ten weeks later against untreated lengths that had been re-sheeted and rolled at the same time.

  • Aggregate held, deformation minimal Deliberate wheel spins on an uphill corner left the treated surface intact.
  • The untreated control went backwards The same material, re-sheeted the same day, corrugated, potholed and lost its fines.
  • Further work commissioned TfNSW went on to have Gravel Lock treat road shoulders on a major highway section elsewhere in the region over Christmas 2024.
Location
Kosciuszko National Park, New South Wales
Industry
National park roads — Transport for NSW
Product
RDC Road Dust Control
Treated
October 2024

More projects

Full case studies, with rates, materials and site conditions, are available on request.

  • A water tanker discharging on a construction haul road TEL Alliance Project NZ Highway construction · 2014 A 28 km haul road went from four water carts to one, saving $2,500+ a week, with no grading needed for the seasonCase study (PDF, 2 pages) RDC
  • A water tanker spraying a quarry road, the spray coming from beneath the tank Winstone Quarries NZ Quarry 80%+ water savings and $50,000+ saved annuallyCase study (on request) RDC
  • A treated gravel road running through gum trees Far North District Council NZ Council roads · 2014 to 2020 Six summers of gravel road dust control across multiple sites in NorthlandCase study (PDF, 2 pages) RDC

Results from Gravel Lock field applications. Performance varies with material, traffic and climate.

Built for the people who keep roads running.

  • Water truck spraying a quarry embankment

    Mining and quarries

    Dust control for haul roads and working areas, with erosion protection for stockpiles, overburden areas and exposed ground.

  • Australian road worker repairing asphalt

    Road crews and utilities

    Durable pothole repairs and utility reinstatements, ready for traffic following placement and compaction.

  • Water truck smoothing a dusty construction road

    Civil construction

    Dust control for access roads and working areas, with erosion protection for batters and exposed ground.

  • A water cart spraying from the bar across its rear onto an unsealed council road, the treated surface dark and damp behind it

    Councils

    Dust suppression and reduced maintenance on unsealed roads, plus durable pothole and pavement repairs.

Also proven on

  • Forestry haul roads
  • Hardstand yards and truck parks
  • Runways and helipads
  • Carparks
  • Rural and station roads
  • Golf courses and resorts

From first call to first pass.

From understanding your site requirements to getting the product on the ground, we help make the process straightforward.

Road construction crew on a resurfacing job
  1. 01

    Consultation

    We take the time to understand your site conditions, operational challenges and what you're looking to achieve. From there, we recommend the right product, treatment approach and application requirements.

  2. 02

    Logistics

    We coordinate product supply and delivery to suit your project requirements, working with transport providers and site teams to have the material available when it's needed.

  3. 03

    Application and implementation

    We provide practical guidance on site preparation, application methods and treatment requirements, working with your team or application contractors to help achieve the best result.

Supplied as

Delivered in the format your site runs on.

Flexible supply options to suit your operations and project needs.

From bulk deliveries to smaller quantities and ready-to-use packaged products, Gravel Lock Australia provides practical supply solutions tailored to your site, equipment and requirements.

  1. RDC dust control IBC tote

    RDC

    Road Dust Control

    1,000 L IBC or bulk tanker

    Available in 1,000 L IBCs or bulk tanker deliveries, with supply and freight arrangements tailored to project requirements. Storage tanks, pumps and application guidance can also be arranged where required.

  2. CSC erosion control IBC tote

    CSC

    Co-Polymer Soil Cement

    Concentrate, ex works VIC or NSW

    Supplied as a concentrate and diluted on site with any potable water source, then sprayed or hydroseeded.

  3. PHF pot hole mix pail

    PHF

    Coldmix Pothole Fill

    20 kg buckets, 1 t bulk bags or loose bulk

    Ready to use without heating, with storage life dependent on packaging and storage conditions.

Let's lock down your site.

Tell us about your roads, stockpiles or potholes. We'll recommend a product, a rate and a trial plan.

sales@gravellock.com.au
I'm interested in

We only use your details to reply to your enquiry.